Skip to content
OTG Construction Inc
Tub with a gray-blue stacked-tile surround laid to the ceiling around a window
Bathroom Remodeling · A smaller way in

Wet-Area-Only Bathroom Remodel

The shower and tub zone rebuilt and waterproofed while the rest of the bathroom stays put.

  • 5.0 across 33 Google reviews
  • CSLB #1012429 · Insured
  • Installed by our own crew
  • Free written estimates

In most bathrooms, the part that has actually failed is the wet area. Grout is crumbling in the shower, the tub surround is a glued-on panel that has come away at the seam, or there is a soft spot in the wall that says water has been getting behind the tile for a while. The vanity, the floor and the toilet are usually fine.

This job rebuilds the part that failed and leaves the rest alone. One to two weeks, a smaller budget, and the problem actually fixed rather than covered.

What gets rebuilt

  • Tile, backer board and anything behind them that is wet or soft
  • A properly sloped shower pan, or a new tub set level and supported
  • Full waterproofing — membrane at the pan, corners and curb, and up the walls
  • New valve trim and shower fittings while the wall is open
  • Niches and a bench where the framing allows them
  • Tile to the ceiling or to a chosen line, grouted, with a flexible joint at every change of plane
  • Glass: a frameless panel, a sliding door, or a curtain rod if that is your preference

Why waterproofing is the whole job

Tile is not waterproof and grout is not a seal. What keeps water out of the framing is the membrane behind the tile and the way it is lapped at the corners, the curb and the drain flange. That work is invisible in the finished bathroom, which is exactly why it is the first thing skipped on a cheap job — and why a five-year-old shower ends up back at the studs.

We open the wet wall, look at what the last installation actually did, and tell you what we find before we close it up.

What stays

The vanity, the mirror, the toilet, the floor outside the wet area and the lighting all stay where they are. If the floor tile continues into the shower and cannot be matched, we will say so at the estimate — that is the one place this scope sometimes has to grow.

Where it sits on the ladder

Above a vanity and top swap and below a full bathroom remodel. If you want the tub gone entirely, that is a tub-to-shower conversion; if you want the finished result to be a large open shower, see walk-in showers.

Every version starts the same way: we look at the bathroom, price the scope in writing, and name what is behind the tile as far as we can see it before work starts.

Start smaller if you want

Every job on the ladder stands on its own

Nobody has to start with a full remodel. Each rung below is a complete job we quote on its own — plenty of people do one, live with it, then call back about the next.

  1. 01Countertops only2–3 days on site
  2. 02Vanity and top2–3 days on site
  3. 03Cabinet refacingAbout a week
  4. 04Wet area only1–2 weeks
  5. 05Cosmetic kitchen refresh2–3 weeks
  6. 06Full remodel4–6 weeks
Reviews

What our customers say

5.0 across 33 Google reviews — read them all.

  • ★★★★★
    Good to work with them. Good quality cabinets and countertops. Always respond.
    Andrii Rozvodovskyi3 weeks ago · Google
  • ★★★★★
    OTG construction remodeled our small bathroom. The service was fast, professional and high quality. They took our suggestions and turn it into a perfect bathroom. Won't hesitate to use their services again. I definitely recommend them for your remodel projects…
    Anna Burchik-Schofield2 months ago · Google
  • ★★★★★
    OTG provides excellent service and craftsmanship. They have a huge variety of options, we found the one we like right the way. They completed our kitchen countertop in a single day. They were even kind enough to rush the timeline to accommodate my pregnancy. H…
    Veronika Popova6 months ago · Google
  • ★★★★★
    OTG Construction was outstanding from start to finish. From the initial consultation and design meetings through demolition and completion, they delivered exactly what they promised. Their quality of work and professionalism truly set them apart. I will abso…
    Lisa Cortez6 months ago · Google
  • ★★★★★
    I tried OTG guys for first time, they did our countertops with no problems and issues. I recommend this company. Nice and kind people.
    916 Handymana year ago · Google
Read all 33 on Google ↗
Next step

Get a written number for this job

We visit, measure the room that exists, and price the scope you actually want — in writing, before anything is committed.

Get a Free Estimate(916) 500-0840Mon–Fri 8:00 AM – 6:00 PM

We work across the Sacramento area — see everywhere we go and how far you are from us.

Free EstimateCall Us